Shell construction in Nuremberg completed
The shell of our villa in Nuremberg has now been completed in an inner-city location and very difficult to protect due to the trees. A shoring had to be constructed at great expense so that the pool level with [...]
Spectacular shell of our villa on the river completed
The very complex and difficult shell of our villa on the river in Leipzig has now been completed. A sloping pool with a strong overhang in the embankment of a river presented the structural engineer and the excellent shell [...]
Competition for high-tech villa in Saalfeld successfully completed
The winner of the competition for a very special villa on a slope in Saalfeld has now been found: the client wanted very diverse thin exterior components and a special glass cube look, which is now being finalized as [...]
Fine studio completed
The new finishing studio on our office building is now also in use: From now on, design and art projects will be developed and realized here
Villa Simmersee – The winning design
This design emerged as the winner of a design competition for a villa on Lake Simmersee: The multi-storey house opens up towards the garden in an L-shape. The straight-lined Bauhaus villa with gabled roof is both timeless and innovative: [...]
Winning design for 4-storey hillside house
The design competition for a 4-storey hillside building has been decided: The winning design has been finalized and will be further planned in 2021. The 4-storey town villa is situated on a steep slope in the village of Musberg. [...]
Avantecture study competition successfully completed
We produced 3 architectural studies for our Villa am Berg in North Rhine-Westphalia. The client chose their winner and also had optimal parts of the 2 other studies integrated. The design for this luxury villa with over 750 square [...]
The Bruderhäuser move into the expansion stage
The extended shell with the windows and the roof covering of both houses are now complete. In record-breaking construction time, this ensemble of special architecture is being built in the middle of a large development area with rather ordinary [...]
“The Curve” on the home straight
The time has finally come: after exactly 10 months of construction, the project is now entering the finishing phase of the outdoor facilities - everything is ready inside! We will soon be able to order our photographer there and [...]